Thursday, December 30, 2010

New Inspections

After finishing an inspection report, I moved onto setting up two new inspection assignments for RIDOT. Assignment #13 has 20 bridges that will be inspected sometime in March and April. Assignment #14 has 13 bridges that will begin in May. A few of the bridges I have actually inspected in the past and look forward to see how my inspections skills have changed (for the better hopefully).

Tuesday, December 28, 2010

Survived Skiing, Christmas, Family and a Blizzard

It's been a full week since I was last night the office, I lost a beard, gained a couple pounds and some bruises and missed a day snowed in down in Plympton MA with snow falling up to 18 inches in areas of Mass. Today I'm back in the swing of things and working on the Point Street Bridge fracture critical inspection report.

The Blizzard of 2010 has certainly effected my commute and added on a seconds with the classic marking your spot with random objects.

If you somehow did not hear about the blizzard or didn't see any pictures check it out.