After finishing an inspection report, I moved onto setting up two new inspection assignments for RIDOT. Assignment #13 has 20 bridges that will be inspected sometime in March and April. Assignment #14 has 13 bridges that will begin in May. A few of the bridges I have actually inspected in the past and look forward to see how my inspections skills have changed (for the better hopefully).
No comments:
Post a Comment