A couple months ago I was down in Louisville KY to help inspect the Kennedy Bridge which carries I-65 over the Ohio River. Earlier in the year I was out at the Kennedy Bridge to inspect the floor system for Kentuckey's Transportation Cabinet (KYTC) since they wanted a detailed inspection before they decided to rehab or replace the deck and stringers. Previous Post about Kennedy Bridge floor system.
See that post for photos and details about the bridge. This inspection, much like the previous floor system inspection was done almost completely by rope access climbers. Two days were used for snooper and man-lift work on the weekend when traffic was not an issue.