Monday, December 13, 2010

Chester / Becket MA Designs

With the submittal date soon approaching for the Becket and Chester bridges, I gave up my free time after work to stay late and assist with markups and specifications. I don't know if I was having fun but it never seems that there is enough time when its a late Monday night.

The designs which are currently at 25% completion and the designs will replace the existing superstrucutres which currently date back to the early 1900's with new CONTECH arch systems or curved steel girders.

MassDOT currently has information about the designs on their site (http://www.mhd.state.ma.us/ProjectInfo/Main.asp?ACTION=ViewProject&PROJECT_NO=605440)

CONTECH is a great design solution for the modern engineer
http://www.contech-cpi.com/

No comments: