Today I used Bridge Rating and Analysis of Structural Systems (BRASS) to check the output generated by
VIRTIS. BRASS calculated the legal truck loads which
RIDOT requires for
their bridge ratings. After the check a few
mistakes were noticed and they can be corrected. After the mistakes are corrected the report can be finished and ready for
subtitle on April 9
th.
No comments:
Post a Comment