Showing posts with label truss. Show all posts
Showing posts with label truss. Show all posts

Tuesday, June 17, 2014

Owensboro KY Routine and Fracture Critical Inspection


Yesterday I arrived in the balmy city of Owensboro KY to inspected the Glover H. Cary Bridge. The carries Indiana 161 and Kentucky 2262 over the Ohio River. Today we began our inspection of the truss starting at node 0. By the end of Day 1 we reached node 20 on the upper chord with two teams and node 24 on the downstream lower chord. With a high temperature of 93 degrees we were spent and my right hand had begun to cramp up. The truss makes great use of solar panels for powering the lighting, which were not on during inspection hours for safety. All of our climbers are now SPRAT certified and we are looking forward to many more climbing projects coming up at the end of the summer.

Here is a taste of the climbing that I caught with my GoPro














Here is the bridges information from Wikipedia:
The Glover H. Cary Bridge is a continuous truss bridge that spans the Ohio River between Owensboro, Kentucky and Spencer County, Indiana. It was named for the late U.S. Congressman Glover H. Cary (1885–1936), and opened to traffic in September 1940. It was originally a toll bridge, but tolls were discontinued in 1954.

The bridge was funded through a $1.03 million federal grant, part of President Franklin D. Roosevelt's New Deal program, and public fundraising efforts. At first, the bridge connected Kentucky Highway 75 to Indiana Highway 75; in 1954, Kentucky 75 was redesignated U.S. Highway 431 and Indiana 75 became U.S. Highway 231.

The bridge was closed temporarily for a day and a half the weekend of March 13, 2011, due to the need for emergency repairs to the bridge deck with traffic temporarily detoured over the William H. Natcher Bridge. Following that emergency repair, transportation officials pressed ahead with planning and design on a full-depth deck rehab that was already scheduled for bidding in April 2011.


Structural condition:
Following the collapse of the I-35W bridge in Minneapolis, Minnesota in August 2007, Kentucky officials (including Governor Ernie Fletcher) sought to reassure motorists that Kentucky's bridges are safe by conducting a special safety review of all long-span bridges at that time. The Cary Bridge was subject to a detailed biennial inspection in August 2008. Kentucky and Indiana highway officials conducted a joint walk-through inspection of the structure on September 22, 2008.

On July 5, 2011, the Kentucky Transportation Cabinet closed the bridge to all traffic for a $3 million partial rehab of the bridge deck after a large hole developed in the concrete driving surface. Hall Contracting of Louisville was the prime contractor on the 3-month project. The project, which saw 40% of the bridge's deck replaced, was completed and the bridge reopened to traffic on September 30, 2011—three days prior to the October 3 deadline imposed by KYTC on the contra

Prior to its reopening, the bridge was opened to pedestrians and bicyclists for "Bridge Day" on Sept. 30; thousands of visitors crossed the 72-year-old span between the hours of 8:00 AM and 6:00 PM, when crews began preparing to reopen the bridge to auto traffic, which occurred at 6:30 PM.


Tuesday, April 1, 2014

Ohio River Bridge Inspection



This was my second trip to Kentucky to help inspect one of the Ohio River bridge crossings. I have now been part of four of the river crossings and look forwards to being part of many more.

For this inspection we were doing a detailed inspection of the floor system so the state would have a very detailed report of the current condition. They plan to use this report to justify their reasons for the new deck replacement and whether or not to keep the stringers, which currently control the rating for the bridge.

One detail which we noticed were the diaphragms over the floorbeams had cracks propagating from the toe of the weld. A few locations had  propagated into the web of the stingers.




We even got one day off which gave us time to check out the bourbon trail. We stopped by the Maker's Mark Distillery and the Jim Beam  Distillery.

Tuesday, March 25, 2014

Emergency Bridge Inspection

Had to perform an emergency bridge inspection last week for the first time in my career. I was already down in Louisville, KY for the inspection of the Kennedy Bridge which crosses the Ohio to Indiana. Soon after hearing that a bridge further upstream had been closed, we received a phone call from the state asking for our assistance. We assembled relatively quickly even with the hour long drive to the bridge site.


Early in the morning, while construction workers were preparing the bridge for it's future move to it's permanent concrete piers, a bearing at the southwest corner dislodged and injured a construction worker. After the bearing had dislodged, the upstream truss fell about 12" until it made contact with the temporary pier. Although there were signs of movement throughout the southern span the bridge remained in good condition.



Monday, October 21, 2013

Continuous Warren through truss bridge

A few weeks ago I traveled to Kentucky for an inspection of a Continuous Warren through truss bridge. The truss was built in 1985 (same age as me!). The bridge is in good condition which is surprising since I am use to the corrosion in New England.

The bridge has a total length of 2,314.4 feet with the main span over the Ohio River spanning 740.0 feet. The deck has a width of 44 feet and carries 13th Street one way traffic northbound with three lanes.


It was my first experience with tv news crews being interested in an inspection, sure enough we made it onto the new that evening with video of our lane closure before we asked them to kindly leave our traffic pattern.

Using limited equipment the majority of the inspection was done using rope access or free climbing. The vertical members were inspected by rope with drops up to 84 feet. The top chord was inspected using a simple flip line and always remaining 100% tied off. The chord consists of built up welded members and gusset plates.


Monday, October 14, 2013

Cantilevered Warren through Truss Bridge (riveted)

A few weeks ago I traveled to Kentucky for an inspection of a riveted Cantilevered Warren through truss bridge. The truss was built in 1930 and rehabilitated in 1986. The bridge is in good condition and I was surprised since I am use to the corrosion in New England.

The bridge has a total length of 2,277.3 feet with the main span over the Ohio River spanning 738.7 feet. The deck has a width of 22 feet and carries 12th Street one way traffic southbound.


It was my first experience with news crews being interested in an inspection, sure enough we made it onto the new that evening with video of our lane closure before we asked them to kindly leave our traffic pattern.

Using limited equipment the majority of the inspection was done using rope access or free climbing. The vertical members were inspected by rope with drops up to 115 feet. The top chord was inspected using a simple flip line and always remaining 100% tied off. The chord consists of built up riveted members and eye bars with pinned connections.


Besides areas of minor corrosion and minor impact damage the most sever deficiencies were areas of pack rust between gusset plates and pins.