Tuesday, June 17, 2014

Owensboro KY Routine and Fracture Critical Inspection


Yesterday I arrived in the balmy city of Owensboro KY to inspected the Glover H. Cary Bridge. The carries Indiana 161 and Kentucky 2262 over the Ohio River. Today we began our inspection of the truss starting at node 0. By the end of Day 1 we reached node 20 on the upper chord with two teams and node 24 on the downstream lower chord. With a high temperature of 93 degrees we were spent and my right hand had begun to cramp up. The truss makes great use of solar panels for powering the lighting, which were not on during inspection hours for safety. All of our climbers are now SPRAT certified and we are looking forward to many more climbing projects coming up at the end of the summer.

Here is a taste of the climbing that I caught with my GoPro














Here is the bridges information from Wikipedia:
The Glover H. Cary Bridge is a continuous truss bridge that spans the Ohio River between Owensboro, Kentucky and Spencer County, Indiana. It was named for the late U.S. Congressman Glover H. Cary (1885–1936), and opened to traffic in September 1940. It was originally a toll bridge, but tolls were discontinued in 1954.

The bridge was funded through a $1.03 million federal grant, part of President Franklin D. Roosevelt's New Deal program, and public fundraising efforts. At first, the bridge connected Kentucky Highway 75 to Indiana Highway 75; in 1954, Kentucky 75 was redesignated U.S. Highway 431 and Indiana 75 became U.S. Highway 231.

The bridge was closed temporarily for a day and a half the weekend of March 13, 2011, due to the need for emergency repairs to the bridge deck with traffic temporarily detoured over the William H. Natcher Bridge. Following that emergency repair, transportation officials pressed ahead with planning and design on a full-depth deck rehab that was already scheduled for bidding in April 2011.


Structural condition:
Following the collapse of the I-35W bridge in Minneapolis, Minnesota in August 2007, Kentucky officials (including Governor Ernie Fletcher) sought to reassure motorists that Kentucky's bridges are safe by conducting a special safety review of all long-span bridges at that time. The Cary Bridge was subject to a detailed biennial inspection in August 2008. Kentucky and Indiana highway officials conducted a joint walk-through inspection of the structure on September 22, 2008.

On July 5, 2011, the Kentucky Transportation Cabinet closed the bridge to all traffic for a $3 million partial rehab of the bridge deck after a large hole developed in the concrete driving surface. Hall Contracting of Louisville was the prime contractor on the 3-month project. The project, which saw 40% of the bridge's deck replaced, was completed and the bridge reopened to traffic on September 30, 2011—three days prior to the October 3 deadline imposed by KYTC on the contra

Prior to its reopening, the bridge was opened to pedestrians and bicyclists for "Bridge Day" on Sept. 30; thousands of visitors crossed the 72-year-old span between the hours of 8:00 AM and 6:00 PM, when crews began preparing to reopen the bridge to auto traffic, which occurred at 6:30 PM.


Wednesday, April 16, 2014

Cable Stay Bridge Inspection


Last October I was part of a cable stay bridge inspection in Boston, MA. While I was away in Kentucky inspecting, the rest of my office was busy inspecting the underside and beginning the lower section of the piers and cables.

After I arrived home I had a day off and I began my part of inspecting the upper portion of the pier towers and cables which reached heights of 270 feet over the roadway. Since equipment could not efficiently inspect that high we used SPRAT climbers (myself and other guy from PA). We started by carrying over 1,000 feet of rope to the top of the north tower and rigging up our lines and rescue lines. That night we began to inspect the northern cables. With limited hours (11pm to 3am) we had little time to inspect since we were not allowed to enter the towers until lane closures were out. The first few nights were mainly learning what was the most efficient way to climb. The limiting factor for this bridge was our need for night work and thus lane closures. Luckily for us weather was good and winds were calm (less than 10 mph most nights).



As far as how we climbed, for the concrete pier towers we were able to climb out of the top at the aviation beacon and descend to the portion that was inspected by man-lifts and then ascend back up to the beacon. The first few nights we tried different ways such as ascending from a man-lift about 110 feet above the roadway (figured out that we can climb faster than a man-lift). Next we tried rope to rope transfers from the access vent located about 130 feet over the roadway. This was fast but each night we had to tie off the ropes which led to us ending almost an hour early for this.



For inspecting the cables we started off just like we did before from the aviation beacon but we carried a pair for rollers which were used to hold us ear the cables. This allowed us to stay within an arms reach of the cable we were rolling on and allowed us to see the cable below us. When we were low enough we exited the cable onto a man-lift which was waiting for us. Most nights we inspected 6 cables, we originally thought we could inspect more each night but due to less time each night we weren't able to inspect the 9 we thought we would be able to.







Monday, July 8, 2013

SPRAT Level I Rope Access Training


Two weeks ago I attended SPRAT Level I rope access training in Chicago. Going into the class I thought it was be easy and at most be fighting off boredom while hearing about the dangers and procedure of rope access for hours before actually getting on the ropes.

It only took 60 minutes before I knew this class was unlike any I had ever taken before. After going over the fundamentals we strapped on our climbing harness and headed out to the "hazard zone".

Day 1:
First we were shown what equipment is used for ascending and descending, we also went over our back-up devices (fall protection). Next our instructors went over how to ascend and then switch over to descending. Then we were shown how to descend. It sounds very easy but seeing it for the first time looked and was more difficult than they made it look.

After practicing for a while we took a break and went over some of our equipment (helmet, harness and carabiner).

Next we were shown how to switch from one rope set up to another. First ascending one rope setup, switching to descending and finally ascending on the second rope setup. After reaching a stopping point or your area of work/inspection you descend from your first rope setup which makes you plum over your second anchorage. 


Day 2:
Our second day we started off learning how to do a long re-belay which is close to switching from one rope to another but accentually doing it one four rope setups. This will be used a lot for inspections over areas which can not have hanging ropes or do not have anchor points directly above your point of inspection.

Next we were shown how to pass a mid-line knot. Not much to explain here but like everything else it was a little tricky at first.

Next we took a break and learned more about our back up devices (Kong and ASAP) and our I'D (industrial descender).

After we went over deviations which is where your ropes are pulled away from the anchor point to avoid an object such as a cantilevered overhang.

With a nice lunch break we gained back some strength and learned how to perform a rescue with a person in descent. This was one of the more difficult processes with lots for steps. Our first attempts took a while but were all successful.

Day 3:
Today we started off with a long commute to class due to flash flooding in the Chicago area. After passing through roads with up to two feet of standing water we finally made it to class.

Once in class we reviewed our up coming test questions and practiced some of the techniques we had learned in previous days.

Next we were shown how to do edge negotiations, which is the process of ascending up and over an end or descending down from an end. For most of our inspections we will be using this multiple times and it uses up a lot of energy.

After lunch we started off with learning how to set up anchorages and set-ups.

Next we learned more about our handled ascender, pulley and sling and reviewed the information in each pieces manual. 

Day 4:
Practice makes perfect! Today we worked hard practicing everything we learned and perfecting anything we felt needed improvement. For me I practiced rescues, edge negotiations and long re-belays.

Day 5:
Test day.

Written 40 question multiple choice. (Slipped up and got one wrong)

Oral Test I had to explain everything there is to know about helmets (there is more than you think there is)

Finally we get on the ropes and show them everything we know.

Everyone in our class passed with flying colors.

If you're looking into taking a SPRAT rope access class I highly recommend Elevated Safety they have a great group of instructors who are friendly, knowledgeable and have work experience in multiple fields. Just in our class we had 5 bridge and transportation engineers, 2 rock fall guys and a historical façade restoration. 

Thursday, November 18, 2010

Rope Access

Today was my first experience with a rope access inspection down in Cumberland RI on a pedestrian bridge. The bridge was part of our fracture critical inspection assignment and would have been $30,000 to rig. Using rope access saved the state money and time. Three RIDOT bridge group members even came to the bridge to see this in action.
Rope access is used in many countries but is still not common in the United States. Since rope access does not have regulations like many other forms of inspection techniques, it is important to be properly trained and to have redundant safety measures like having SPRAT certified technicians.
Rope access was used for most of the bridge but some parts were inspected from the ground. The ends of the bridge were fairly close to the ground which allowed the use of ladders.

Unfortunately the ends of the bridge were also guarded by two horrible smells. The West end of the bridge was located close to a sewer line and happened to be near a manhole. The East end smelt of a skunk, fortunately we were not able to confirm if there was a skunk there or not.