This I-Way bridge was unlike most fracture critical bridges that I have inspected in the past. Most consist of either some type of truss or a through girder system but this bridge's superstructure has two steel box girders and a concrete deck. At one end of the bridge there is a curved section which required a deep concrete counter weight. Unfortunately for me I was given the task of crawling into the narrow corrugated pipe to check the bearing connection at the end.
Showing posts with label box girder. Show all posts
Showing posts with label box girder. Show all posts
Wednesday, September 8, 2010
Friday, August 28, 2009
Providence's I-Way Invertory Inspections
Today started with a stop in Millbury MA to pick up an ice coffee at DDs and bagel. With sunny skys and a nice wind off the water, it was a shame to spend the day inside of a steel box girder. With access hatches at the ends of each span I was able to enter with the help of a bucket. The box girder is 8 feet tall and has trapezoidal shaped girders which allowed for easy movement through the inspection.
The next bridge on the other hand had limited space and when I had to double check bearing connections and end diaphragm screens, movement was awkward and time consuming.Thursday, August 27, 2009
Providence I-Way Inspections
Today I inspected the interior of a steel box girder bridge in Providence RI, I walked each span hunched over in short trapezoidal shaped box girder trying to avoid the construction debris that still remained behind.
Wednesday, August 26, 2009
Providence's I-Way Inventory Bridge Inspections

Today I assisted in the inspection of the extior of a steel box girder bridge in Providence RI. The large three box girders carry a bare concrete deck ramp from I-95 Northbound to I-195 Eastbound. The weather was great for the inspection with clear skys.
Subscribe to:
Posts (Atom)

