Friday, October 28, 2011

Find Structurally Deficient Bridges near you!


Just found out about this site which shows Structurally deficient bridges on google, they even break down the bridge with the average daily traffic (doesn't show % of truck traffic tho), year built, ratings and even the last date of inspection (which I'm hoping is not up to date in Mass since they are out of cycle).

There is also a table that breaks down the states. I'm not sure if I should be happy or that Rhode Island and Massachusetts are near the top of the list.

Thursday, October 27, 2011

I-195 Demolition in Providence Slide Show


Not much of a post but saw this slide show online and thought it was pretty cool showing the demolition of most of the I-195/I-95 interchange in Providence while they were putting in the Iway.

Demolition Slide show

Tuesday, October 25, 2011

RIDOT Finally Opens Iway Ramp

 Aerial view of final Iway ramp
So a while ago I think I wrote about inspecting a ramp and how we found pier columns with extensive cracking before they had been opened for traffic.

After non-destructive testing was done they found out that one column had significantly lower compressive strength than the design called for.

The ramp was not opened and repairs were ordered. The superstructure was braced with shoring and the top of the concrete pier column was taken done to the reinforcement and the concrete was placed again.

The other week when I was in the area I noticed that the ramp was opened October 3rd to all traffic and was the last ramp to open for this project.

Tuesday, October 18, 2011

Steel Multi-Beam with Cover Plate Rating

Started my second rating today. The bridge is located in Newport RI and is near "THE" Newport bridge which I inspected a few weeks ago.

The bridge consists of ten rolled steel beams which span 86'-1" and carries RI 138 with a composite concrete deck and asphalt wearing surface. The bridge has a line of summitry along the median which made the rating slightly easier from a ten beam system to two five beam systems. I ended up choosing a typical exterior and interior beam and both fascia beams which displayed section loss at the abutments.

After choosing the beams to rate, I calculated the dead loads and live load factors and then I calculated the equivalent plate geometry to account for beams with section losses. Since BRASS-GIRDER does not include a command for section loss the beams were modeled as plate girders with section properties that compare to the rolled beam.
I then moved onto setting up the BRASS-Girder input file, which were broken down into as built and as inspected for those with section loss.

Thursday, October 13, 2011

Weathering Steel Multi-Girder Rating


Started the new job last Monday and jumped on a rating right away.

The rating is part of a contract for RIDOT and is a steel multi-grider system with a composite deck. The bridge is located in downtown providence and spans 102 feet over the Woonasquatucket River.

First I calculated the dead loads and live load factors and then I moved onto setting up the BRASS-Girder input file.

The bridge had for bays with different types for utilites which made selecting which girders to rate a little more difficult.

Its been over a year since I last used BRASS so I had to shake out some of the rust (lots of errors and looking up most of the input order). After about three tries I was finally able to get it to run correctly.

Saturday, September 24, 2011

Newport Bridge Inspection


This coming week I will be down in Newport RI to inspect the Pell Bridge. This will also be my last week with WSP Sells, as I start my new job with Michael Baker Engineering on the 3rd. 

The Pell bridge carries RI Route 138 from Newport to Jamestown and has a structure length of 11,247 feet with a maximum span of 1,601 feet. at the highest point the deck is about 200 feet above the water and over 400 high at the tops of the towers. luckily I'm not afraid of heights!
The past few weeks the bridge has been inspected from water level on a barge with an 80 foot manlift. This coming week we will be using two 62 foot snoopers (under bridge inspection units). We will be able to see about 2/3 of the underside from our first setup and later able to inspect the remainder from the other side.

From what I've heard the Pell has the longest suspension span in New England and is ranks 75th in the world.






Thursday, September 1, 2011

Pedestrian Overpass

This past week I completed the inspection for the India Point pedestrian overpass in Providence RI. The bridge allows foot traffic to cross over I-195, Ramp EI and India Street. The bridge give access from the Eastern half of Providence to cross I-195 to a small park on the water.

The bridge was built in 2008 and has a total structure length of 250.9 feet with a maximum span of 91.2 feet (over I-195). The maximum span consists of concrete butted box beams.

The top of the bridge consists of stone pavers, vegetated garden lighting and seating. During the inspection we noticed that the bridge had an unusual amount of water draining at one corner of the bridge. My only assumption would be from the irrigation for the gardens. Hopefully this does not continue to leak and cause damage to the structure. 



Tuesday, August 23, 2011

Bike Path Thru Girders

The past two days I was out inspecting two bridges which were converted to carry new bike paths instead of railroad lines.

Since the bridges were both rehabilitated recently they were a breeze to inspect. Other than gouges along the bottom flanges, the bridges were in excellent shape. Both bridges were simple spans consisting of built up thru plate girders.

It was also nice to have friendly people riding by instead of the typical motorist who shouts motivational words as they pass.




Friday, August 12, 2011

Critical Finds

This past week I was busy with bridge inspections in Rhode Island and worked about 90ish hours in five days. The week started off hot and muggy and was made even worse when I started finding broken welds in our first shift and then section loss holes in beam ends in my second shift.

This continued for most of the week and was really making me question the integrity of the past inspections. Both the state and federal government QC the actual inspection reports and do a great job making sure the provided information makes sense and correctly identifies the condition of the bridge but should they go one step further and field check some bridges too? Should consultants be rated on the accuracy of their field investigations?

I've also noticed that some of the past inspection reports from different consultants have started to take a "lazy" approach to writing a report. Instead of writing the conditions they observed they state that the conditions are generally the same as the past inspection. I feel that an inspection report should convey the current conditions of a bridge and not the conditions observed in the past.



Well that's enough venting for now, I meant to write about the process of critical finds but was side tracked,  I'll post pictures and bridge information for the past month or so this coming week when I have a nice and easy 40 hour week.


Tuesday, July 26, 2011

Rolled Steel Beams

The past two weeks I've been very working on the routine inspection of the Huntington Viaduct in Providence RI. The rolled steel beam superstructure with composite concrete deck spans across Route 10, AMTRAK and a lot of grass.

After this week when I have time I'll update with photos and more info but for the time being I need to crash since this will most likely be a 90 hour work week.