Monday, July 11, 2011

Arch Design

The past few weeks I've been busy helping with the design of a few bridges. A few weeks ago we submitted our 90% bridge design for five bridge in western Mass. Two weeks ago we submitted our PS and E for an Inverset bridge up in central Mass. This past week we were very busy trying to get our 90% bridge design and 100% highway design finished.

Unlike the bridges in western Mass I was only able to design a few components of the arch in south eastern Mass but helped a lot with the drawings.

A taste of the designs which I accomplished this past month:
U-Wingwall
Curtain Wall
Backwall
Elastomeric Bearing
Retainer Plate
Bridge Rail
Pedestal
Chamber
Seismic
Thermalmovement
Drainage
Piece Weights for Precast Abutment backwall, stems and footings








Monday, May 23, 2011

Wicked Busy with Bridges

Title really says it all, I've been really busy helping with five bridge designs which we are trying to complete by the end of the month. So far I've "only" been working around 60 hours but as the date approaches I think that number will get higher.

Two bridges consist of 7 horizontally curved steel plate girders. One bridge will consist of 7 steel plate girders (straight). The final two will consist of conspan rigid frame sections.

The existing abutments be cut down and remain for channel protection. The proposed footings, abutments and wingwalls with all be precast pieces which will be assemble off site before hand to make sure they are fit correctly.

Also found out that I will be part of an inspection team which will be inventory inspections for several non-NBIS bridges in RI, hopefully some near the beach this coming summer.

Tuesday, March 22, 2011

Arch Bridge Design in Southern Mass

So last Thursday (St. Patrick's Day) after completing a bridge inspection (see previous post), we headed over to take photos of drainage pipe, trench and salt water march replication area.

When we arrived we thought it would be a good idea to double check with the office before simply taking the photos and leaving the site which is located a good hour or so from the office. Good thing we double checked because there ended up being a few extra things to check.

First we had to take photos of where the existing bridge use to be.

Next we had to locate a stone walk way. After that we located a few signs.

Then opened some catch basins and checked inverts and pipe diameters. 

By the time we were finished the water had already risen a few feet.  
Here's a picture from last winter when they were constructing the temporary bridge.    

Friday, February 25, 2011

Precast Abutment Adjustments

Today I'm working on plans for adjusting MassDOT standards for a bridge design. This project is being designed to decrease on site construction time by using as many precast elements as possible. At the moment I'm making changes to the approach slabs, safety curb, elastomeric bearings and endposts. 

Friday, February 18, 2011

Inverset Units from the Central Artery


Today I went up to Littleton MA to check dimensions on inverset units for a bridge that we are designing in Conway MA. The inverset units were used during the "Big Dig" while the Central Artery was being demolished. The units were designed to be re-used after the project in small bridges across Massachusetts.

The units we were looking at consists of three sections that will be assembled to complete the bridge much like double T's showing up at the site.

The project site in Conway is somewhat of a rural area, so it will be great to see these units reduce the construction time and labor at the site.
Bald Eagle out in Conway MA
Existing bridge in Conway to be replaced
This also reminded me of something I saw the other day showing abandoned projects that were to meant to be part of the green way were the Central Artery once was. I completely agree with most of the projects being abandoned but I wish the YMCA had been given a chance since it would have improved the North Station area greatly.
Lard in Littleton MA where some of the Inverset Units are stored for later use
Back to inverset units tho. These units will allow Massachusetts to quickly improve their infrastructure greatly by replacing small deteriorated structures throughout the state. Hopefully the Accelerated Bridge program at MassDOT will realize the full potential of these units before the units themselves deteriorate.

57 degrees out and still have snow up to our knees

Monday, December 13, 2010

Chester / Becket MA Designs

With the submittal date soon approaching for the Becket and Chester bridges, I gave up my free time after work to stay late and assist with markups and specifications. I don't know if I was having fun but it never seems that there is enough time when its a late Monday night.

The designs which are currently at 25% completion and the designs will replace the existing superstrucutres which currently date back to the early 1900's with new CONTECH arch systems or curved steel girders.

MassDOT currently has information about the designs on their site (http://www.mhd.state.ma.us/ProjectInfo/Main.asp?ACTION=ViewProject&PROJECT_NO=605440)

CONTECH is a great design solution for the modern engineer
http://www.contech-cpi.com/

Thursday, May 6, 2010

Chicopee EAP

Today I started working on an Emergency Action Plan (EAP) for a bridge design out in Chicopee MA. The EAP is plan to help assist the city if there is a failure in the storm barriers. The EAP tells the city who to contact and what routes they should use in this emergency.