Monday, May 9, 2011

Timber Pier Bents Special Member Inspections

Still very busy with design work and trying to update when I have a chance.

Back on April 14th I inspected two special member bridges. The first bridge has a timber deck with two timber pier bents and spans over Woonasquatuck River in North Providence. 

The Special member inspection only focused on the timber pier bents which had checks and splits with section loss to the columns along the water line.

The second bridge has rolled steel beams which are two span continuous and spans over Bucks Horn Brook in Coventry.   



Friday, May 6, 2011

Welded Steel Girder

Still pretty busy with design work, so far today I've been busy designing elastomeric bearing pads with sloped sole plates and making changes to bridge sketch plans.

A couple weeks ago I inspected a welded steel girder bridge in Providence RI which carries I-95 Ramp. The bridge was converted from a three simple span bridge to a three span continuous.

Before we could begin the inspection we had to set up the traffic control which was a pretty good work out compared to standing in a bucket. It was also raining cats and dogs and maybe even some other animals as well.

The inspection and traffic control went pretty smooth and we were even able to get pictures of the tops while there was a lull with the weather. 



Thursday, May 5, 2011

Cast In Place Concrete Box Beams

Happy Cinco de Mayo, a couple weeks ago I inspected a cast in place concrete box beam bridge which spans over Oxford Street in Providence RI.
This was my first time inspecting a cast in place concrete box beam bridge and figuring out what beam you are at was a small task but was made easier with exposed rebar chair feet.

The bridge was widened a couple times and now has three new prestressed butted box beams at the North and two along the median. 


Sunday, May 1, 2011

Concrete I-Beam

I have been pretty busy the past couple weeks with design work for five bridges out in Western Mass.

A few weeks ago on I was out Providence RI inspecting the Public Street bridge. The bridge consists of 24 concrete I-Beams.

The bridge was strewn with pigeons and their debris and waste which made a messy rainy day even messier.

  

Several of the beams had spalling at the ends along with bulging elastomeric bearings and a few locations the beams were touching the abutment bridgeseats.

Friday, April 15, 2011

Steel Beam Bridge

The other week on March 29th I was down in Providence inspecting a three simple span mutli beam bridge (Br. No. 060701) which carries Route 6 East and West. The second span carries route 67.9 feet over Killingly Street and has a structure length of 125 feet.

The bridge has 18 beams which are labeled A to R, which makes for a fun time when starting from the South and figuring out which beam you are at.

While finishing up the East side of Span 2 the bucket I was using started to leak hydraulic fluid and the bucket began to slowly twist upside down, luckily I was only 10 feet off the ground. We were able fix the problem quickly (just a new nut vibrated itself loose and needed to be tightened) and get back to inspecting.

The bridge has been struck several times in the past and all the beams have gouges and scrapes along the underside of the bottom flanges and cover plates. One of the beams has a bulge in the web and a small web crack. One of the beams was also twisted at the pier. 





Monday, April 11, 2011

Masonry Stone Arch

Last week on the 30th I inspected a stone masonry arch in Providence RI. The Arch is located near Roger Williams Zoo and spans over Polo Lake. The arch was in 1889 and spans 30 feet over the lake.

Being so old it is no surprise at the amount of efflorescence, stalactites and incrustation build up. The inspection was a special member since the bridge is posted for 15 tons and was easily inspected with our boat.  

Friday, April 1, 2011

Cranston Stone Masonry Arch

Busy with inspections the past week and was not able to do any up dates, so I will try to squeeze a couple quick ones in. 
Last Friday I was down in Cranston inspecting a stone masonry arch which was built in 1896 and is on the National Resgister of Historic structures. The arch spans 41 feet over Pocasset River. 
The arch is in great condition for being so old, with scattered areas of missing mortar and efflorescence throughout the joints and the only major problem was a tree growing out of the spandrel wall near the crown. The tree pushed the spandrel wall stones upward cracking the mortar joints and stones, along with leaving a gap of up to 3 inches.
For the inspection we used a 62 foot UBIU (Snooper).

Thursday, March 24, 2011

Reducing Massachusetts Deficient Bridges

The great work of the people at MassDOT's Accelerated Bridge program and consultants (like me) have been able to start reducing the number of structurally deficient bridges.


I think the state did a great job with this graphic, showing that the number of bridges has dropped from 543 to 475 which is a big step in improving our states infrastructure and creating jobs for a lot of Mass residents.